Skip to Menu Skip to Search Contact Us Turkey Websites & Languages Skip to Content
 

Boydak Enerji Üretim ve Ticaret A.Ş. shall construct and operate the Çanta WEPP Project which has an installed power of 45 MW. The Project is located in the northwestern part of Turkey, in Çanta Köy within the Silivri District of the province of Istanbul.

SGS has been choosen for this project due to best service prices and their reputation within the Power sector.

SGS will assign 7 experts conducting supervision of construction and electrical implementaion as well as owners engineering services to the client

  • 1 Electrical Engineer
  • 3 Electrical Technician
  • 1 Civil Engineer
  • 1 Civil Technician
  • 1 Topographer

During the project period of 9 months, services will include the following

  • Consultancy Services on ETL Electricity, Construction and Assembly Works of 45 MW Çanta WEPP in silivri province in ISTANBUL
  • Controlling of the construction, assembly and cabling, testing and commissioning works of 154kV Çanta WEPP TM
  • Controlling of the construction, electrical and mechanical works of the control building
  • Controlling of all construction works to be carried out starting from the turbine connection point of the OG Park composed of 19 Nordex N100, 2.5 MW wind turbines until the 154kV power transformer, testing and commissioning of step-up transformers, assembly of the concrete cottages and the RMUs inside, all cabling, testing and commissioning works on site

 
 
 

Erhan Aydin 
Business Development Coordinator